Updated DeepCore Exile 0.13.1.
The Geothermal Regulation Station now requires the actual geothermal industry to run continuously for the full 60 seconds:
- Station itself must be fully powered.
- 6/6 Reinforced Cave Supports within 28 tiles.
- 2/2 Deep Ventilation Fans within 28 tiles.
- 2/2 Geothermal Bores actively extracting from geothermal wells.
- 1/1 Flash Plant actively running the geothermal steam recipe.
- 2/2 Geothermal Turbines actually generating electricity.
- Any failed requirement resets progress to 0/60 seconds.
Opening the Regulation Station now gives a dedicated live panel showing every requirement, placed versus active machinery, and the stabilization progress bar. The station also gets a concise custom status showing the first condition preventing progress.
Already stabilized Depth 4 surfaces remain stabilized, while unfinished progress from the old placement-only objective is reset once when updating.