Builds As You Drive
Build Remembers
Build Elevated Rails
Upgrade Existing Corridor
Build & Drive Through Junctions
Remove Old tracks
See Where Build Needs Help
Build Through Walls for Gates
FARL - Fully Automated Rail Layer. Build ground and elevated railways as you drive. Place ready-made junctions, add missing tracks to existing routes, or rebuild their signals. Lay one, two, or four parallel tracks with ramps, signals, supports, and wired power poles.