Advanced Fluid Handling


Valves have been removed due to the current engine limitations. *Check out “Configurable Valves” by Stringweasel for a very clever and convenient valve mod* --Adds I, L, T, and Cross underground pipe extensions. --Adds pipes to ground with I, L, T, and Cross shaped underground outputs that are able to be rotated independent of the above ground port. --Adds an Underground pump. CHECK HOTKEYS FOR MOD.

Content
6 months ago
0.16 - 2.0
45.5K
Logistics

b PY CONFLICT

1 year, 9 days ago

!

1 year, 9 days ago

What's the bug report

1 year, 9 days ago

The following models could not be loaded: Error when loading the prototype of the "underground-mini-pump-t3" object (pump): connection_category no more than one category can be specified for underground connections
Modifications: "Advanced liquid treatment ", Subsequent processing of pianodones (Assembly) Production of pianodones (Extended)

1 year, 8 days ago
(updated 1 year, 8 days ago)

Pyanodons mod is changing something about the connection categories and making it be one too many for underground connections. I cannot do anything about this from my end.

It actually seems like it’s that Advanced Treatment part, if that’s a separate mod, that’s the one doing it.

1 year, 8 days ago
(updated 1 year, 8 days ago)

well, flow control works, but yours doesn't
although it worked on 1.1

1 year, 6 days ago

I just played with my mod yesterday on the full pyanodons suite and didn't get this error.

1 year, 4 days ago

Why am I making a mistake?

1 year, 3 days ago

It might be an odd interaction with a different mod.

New response