Turbines ++


Tired of big nuclear turbine setups? This mod adds new turbines and usage for super/extreme heated steam. With the full setup you will get up to 112.5 MW of power out of 100 MW heat.

Content
2 years ago
1.1
2.67K
Power

g [FIXED] The mod crash with Squeak Through after update

3 years ago

After I update the mod to the latest version, when I run this mod with Squeak Through, the mod crash, but when I run Squeak Through without this mod, the game run just fine.
Could you fix this problem ASAP so I can continue playing the game ;)

3 years ago
(updated 3 years ago)

After I update the mod to the latest version, when I run this mod with Squeak Through, the mod crash, but when I run Squeak Through without this mod, the game run just fine.
Could you fix this problem ASAP so I can continue playing the game ;)

sure im on it - could you send me the crash report?

3 years ago
(updated 3 years ago)

Inside the game they said "Error while running setup for entity prototype "tur_4way_turbine_entity" (generator): next_upgrade target (5d-steam-turbine-02) must have the same bounding box."
Ps. I don't know how to send the whole crash report here, there's no upload button and I can't copy the whole crash report here without getting cut in the middle....

3 years ago
(updated 3 years ago)

Inside the game they said "Error while running setup for entity prototype "tur_4way_turbine_entity" (generator): next_upgrade target (5d-steam-turbine-02) must have the same bounding box."
Ps. I don't know how to send the whole crash report here, there's no upload button....

You can use markdown to upload images. Im on it

3 years ago
(updated 3 years ago)

Inside the game they said "Error while running setup for entity prototype "tur_4way_turbine_entity" (generator): next_upgrade target (5d-steam-turbine-02) must have the same bounding box."
Ps. I don't know how to send the whole crash report here, there's no upload button....

You can use markdown to upload images. Im on it

https://ibb.co/vjsF6yf
https://ibb.co/N3jhwGp
https://ibb.co/7bNCWK1
https://ibb.co/z2QrZ1D
https://ibb.co/6vy85D6
https://ibb.co/b7XXNSx
https://ibb.co/W3RTrNM
https://ibb.co/C9fjFnz
https://ibb.co/vY2n89n
https://ibb.co/1KC03xR

3 years ago

Inside the game they said "Error while running setup for entity prototype "tur_4way_turbine_entity" (generator): next_upgrade target (5d-steam-turbine-02) must have the same bounding box."
Ps. I don't know how to send the whole crash report here, there's no upload button....

You can use markdown to upload images. Im on it

https://ibb.co/vjsF6yf
https://ibb.co/N3jhwGp
https://ibb.co/7bNCWK1
https://ibb.co/z2QrZ1D
https://ibb.co/6vy85D6
https://ibb.co/b7XXNSx
https://ibb.co/W3RTrNM
https://ibb.co/C9fjFnz
https://ibb.co/vY2n89n
https://ibb.co/1KC03xR

Ty - just updated should be fixed now!

New response