Power Overload


Performant, semi-realistic electricity and power distribution overhaul. Power poles can explode if the total electrical consumption on the network is too high. Use transformers to separate networks so that subnetworks do not take more power than they can handle.

Content
12 hours ago
1.1 - 2.1
5.40K
Power

b Error with factorissimo

a month ago
  1. Put down a medium power pole
  2. Put down a factorissimo building in range of this pole
  3. Put down a transformer in range of this pole
  4. Connect the output of the transformer with the pole

The mod Power Overload (2.3.3) caused a non-recoverable error.
Please report this error to the mod author.

Error while running event PowerOverload::on_tick (ID 0)
LuaEntity belongs to surface nauvis-factory-floor (index 3) but a LuaEntity belonging to surface nauvis (index 1) was expected.
stack traceback:
[C]: in function 'draw_line'
PowerOverload/scripts/network-rendering.lua:294: in function 'refresh_pole'
PowerOverload/scripts/network-rendering.lua:589: in function 'update_network_overlay'
PowerOverload/control.lua:96: in function <PowerOverload/control.lua:90>

12 hours ago

ty for the report
new version fix this

11 hours ago

looking good with first test :-)

New response