Duvaichon's SE + K2 Tweaks


A couple of small tweaks to SE + K2. Space pipe and underground belt length increases and some power consumption changes for a few machines for right now.

Tweaks
3 hours ago
2.0
0
Logistics Manufacturing

Changelog

Version: 0.8.0
Date: 03. 07. 2026
  Features:
    - Small changes to SE + K2.
  Balancing:
	- Atmospheric condenser maximum power draw reduced to 0.25 MW, in line with K2 default.
	- Electrolysis plant maximum power draw reduced to 0.375 MW, in line with K2 default.
	- Space underground pipe distance increased to 30, matching steel pipe underground distance.
	- Space underground belt distance increased to 20, matching express belt underground distance.