Storage Tank Mk2 2.0

by Jtmzac

Adds a fast replacable upgraded storage tank with 100k capacity and more pipe connections. Updated for 2.0

Content
23 days ago
2.0
8.00K
Storage

b Incompatibility with fluid control

9 months ago
(updated 9 months ago)

Loading fails on the initializer correction error is with flow control mb
Full Error:
Error while running the setup for entity prototype "pipe-elbow" (storage-tank): next_upgrade target (storage-tank2) must have the same fast_replaceable_group (storage-tank != pipe)

9 months ago
(updated 9 months ago)

Looks like the author of flow control just released a patch to fix that error.
Let me know if there's still issues.

New response