I've been building some of the initial "stages" of the RFP facilities (D-D, D-D + GS, D-D +GS 5%, etc.) and am encountering the same problem as when I first started using RFP two years ago: inability to figure out what mix of structures to make a workable fusion-type reactor site. This problem is what drove me to "shortcut" the entire process by simply doing all the research first and then building only the science pack maker, and then the anti-matter site. This is a shame, because skipping all the in-between steps sorta wastes all the time that had been put into creating the various fusion facilities.
The problem that I THINK I see is the power draw of the Plasma Heater. According to the tech, it initially needs 400MW which is a huge problem. Later tech levels are supposed to lower that need...but it's not. If you build an isolated D-D site and electrically separate the heater (I use Blueprint Sandbox for this) you find that the heater ALWAYS draws 400MW. This problem causes the power to bounce all over the place. This can be smoothed out somewhat by treating the D-D as if you were on Fulgora...build a few fields of accumulators. If you look at the D-D Heating Efficiency Tech and hover your mouse over the effect designated by the big red +, it says "Deuterium heating -75MW (for example). But according to the Electric Network Info window, that's not happening.
Anyways, the other stuff so far is working. No crashes or graphics glitches so far. Testing out the D-T stage and D-H3 stages are next.