Hi prg,
In general this works nicely, thank you. If there is a railway, the belt planner correctly creates an underground section. However, if there is a rail signal next to the railway, it places the underground entrance ghost on top of the signal, and the robot goes crazy because it cannot build there. Why is it even possible to place a ghost on top of a rail signal?