Drag over oil wells, sulfuric acid geysers, fluorine vents or lithium brine and get
pumpjack and pipe ghosts that end in one output pipe on the side you choose. Works
on every planet, and on any fluid resource a pumpjack can mine (modded ones included).
Using it
- Press Alt+O (or use the shortcut bar button) to pick up the planner.
- Drag over the wells. Shift-drag cancels.
- In the dialog pick the side the output pipe should come out on, and whether to
avoid cliffs. The preview updates as you change either. - Place ghosts. Construction bots do the rest. Ctrl+Z removes everything in one step.
The preview shows pumpjacks and pipes in the fluid's colour, underground spans in
orange, the output pipe circled with the fluid's name, and anything that has to be
cleared in red. Skipped wells get a red outline.
What the plan does
- One output per fluid. A selection with oil and acid gets two separate pipe
networks with an output each. Fluids never touch. - Pumpjacks are turned so their output lands where the pipe is cheapest to reach.
- Undergrounds on straight runs. Four or more straight pipes in a row become
underground pairs (one pair covers up to 11 tiles); shorter runs stay plain pipe. - Efficient layout. The tree grows from the output to the nearest well, one well at
a time, preferring straight pipe. Fields of up to 12 wells try three output spots
along the chosen side and keep the cheapest. - Avoid cliffs on. Pumpjacks and pipes never stand on cliffs. Pipes route around
them or dive underneath (pipe ends stay off the cliff). A well sitting on a cliff is
skipped, because a pumpjack cannot move off its well. - Avoid cliffs off. Cliffs are ignored while planning, preferring clear ground when
it costs little. The cliffs in the way are marked for deconstruction. This needs the
Cliff explosives research, and you are told if it is missing. - Trees and rocks in the way are always marked for deconstruction; they never stop a plan.
Wells are skipped (and counted in the dialog) when they already have a pumpjack, are
blocked by a building or water, sit on a cliff while avoiding cliffs, overlap a
neighbouring well's pumpjack, or cannot be reached by any pipe route.
Limits
- It does not place power poles.
- New pipes keep a tile away from existing fluid buildings so they never join another
network. Connect the output pipe to your own pipes yourself. - Pipes search up to 16 tiles past the outermost wells to get around obstacles.
- Planning runs in one go. Typical fields take well under a second; 60 wells over
150x150 tiles takes a second or two.
License
MIT.