Hi,
i just wanted to share a suggestion for an improvement of YARM: After a while i felt that the displayed information about my mining sites lacked an important point. I was not able to determine the degradation of the mining site, because just looking at the current mining rate per min is not sufficient (unfortunately i am not able to memorize the peak production of each site). I suggest therefore an additional column to display the current production rate compared to the historical maximum rate of the mine:
Example:
Start of operation: 50 miners, output = 1500 ore/min, production rate = 100%
After a while: still 50 miners, but some of them ran dry, therefore only an output of 1000 ore/min, -> displayed production rate = 66% (= 1000 div 1500).
This would help a lot in maintaining your mining sites to adjust the miners (eg: remove those that ran dry or rearange belts if belt cappacity is insufficient)
What do you think?