It seems to me the math isn't great with inserter timescale selection. I understand there is some room for error in regards to arm movement, resource input, and resource output; however, it doesn't seem even close in the math.
Example: Red belt produciton in assembler machine 3
Gear input reads using only 0.339% of a single fast inserter; however, the machine has a ~1 sec pause waiting for gears from a single fast inserter for each production run. This is a base, unboosted assembler being fed from a full blue belt of gears using a single fast inserter.
Is there something I am not understanding or is the math that off?
Pics:
https://imgur.com/a/cbTDKvb
I also added a comparison with the older mod, Max Rate Calculator, which shows needing 1.353 fast inserters for gear loading.