When having overflow in power production, the Production power display bar in the Electric network info window shows incorrect.
For example, I have three Power Plant buildings, and I know for a fact that it is able to produce around 74 MW all together.
Let's say 60 MW is required for the satisfaction bar to be full (the current total power requirement). That would mean the Production bar should be 60/74 full (my power plants produce 60/74 of what they can). But the Production bar shows as somewhere around 1/40 full, as if my power plants are only producing a fortieth of what they can!
When the satisfaction (power usage) is above ~74 MW, the production bar shows correct.